27 September 2012

RDF School in News





Once a Dream is Now a Reality



It is exciting to share the pictures of the School Building which was once a dream is now a reality. This was possible only because of your contribution. Construction is still in progress and another month to go before the building will be operational.

Also attached are the recent news articles of 4H and Cargil organization heads visit to RDF schools, they also visited our school under construction.

Current Status
-        1.  Ground Floor Internal plastering is over
-        2.  First Floor Internal Plastering will be over tomorrow
-        3.  External plastering will be completed by 1st Week of October.

The below items were part of initial scope based on commitments from prospective donors, but since the funds could not be realized till date, the following are being de-scoped. If we receive donations by 1st week of October 2012, then we will be able to get them executed. The total deficit is Rs. 5.5 lakhs. We generated Rs. 39.4 Lakhs so far.

1.       Flooring
2.       Painting
3.       Student Toilet Block
4.       Electrical fittings
5.       Kitchen

Infact the staff and students are happy and content with what they have.

Thank you so much for your generous donation and making a life long difference for really deserving children. Will keep you posted with more information shortly.



12 June 2012

Infor Employees School Building Project - First Major Milestone Accomplished

In continuation to our communication on 21st May 2012 about the School Building Project we are happy to inform that yesterday 10 June 2012, first major milestone has been accomplished by successfully completing the first roof laying work of Infor School Building. After the final Quality Check, work started at 11 AM and was completed by 6 PM.

There were many challenges due to heavy wind and rain the previous day night, there was no power till today morning, gravel shortage, unable to access the site due to fallen branches / trees on roads, slushy soil in and around the site. Due to power failure, water was a major problem.

Though it was very cloudy all through, it did not rain in this village, it was rain in neighbouring villages just a couple of kilometres away during the day, so it is very clear that God’s decision was in favour of a noble deed by Inforians and the roof laying was a Success in spite of so many hurdles.


Material & Man Power for the Roof Laying Work
1.       Gravel ( 20 MM)               - 1350 Cubic Meters
2.       Sand                                      - 945 Cubic Meters
3.       Cement Bags                     - 318
4.       Water                                   - 24,000 Litres ( app)
5.       Labour                                  - 36
6.       Supervising                         - 8 ( 4 From School & 4 from Contractor)
7.       Steel                                      - 3.5 Tonnes
8.       Binding Wire                      - 100 Kgs ( 4 Bundles)
  
Positive Outcome
The student strength of the school is going up by 25 this year due to the upcoming facility and more parents are showing interest to send their children to this school. Parents are waiting for the school construction to be completed.
  
Funds Status
Amount in Lakhs
30-Mar-12
18-May-12
11-Jun-12
Target
25.00
25.00
25.00
Committed
14.78
15.88
16.45
Collected
3.86
8.00
9.83
  
Ways to Donate
 (check the footer of this blog)
Online Transfer
                        Account Details :
HDFC A/c             : 16261450000021
IFSC Code            : HDFC0001626
Name                    : CARE
Account Type       : Savings
Email                    : infor.care@infor.com

Cheque
Cut a cheque In favour of “CARE”

Cash
                Hand over the Cash to your team CARE volunteer.


Current Milestone Payment
Since the milestone is reached, it is time to pay to the contractor. Current Milestone payment is Rs. 7.5 Lakhs and the shortfall is Rs. 4.5 Lakhs.
So requesting each one to contribute for this noble deed.   

Next Milestone Payment
          On Completion of Second Roof, tentative date is 1 July 2012. Amount to be paid to contractor will be Rs. 7 Lakhs
Work Progress Pictures










 

1 May 2012

Shankusthapana of “Infor Employees School Project”


The Shankusthapana of “Infor Employees School Project” along with Vanamahotsav was a very big success.

All the volunteers coordinated very well and set out on a memorable journey on 15th April 2012
For all the participants the day started as early as 3:30 AM in the morning and the best thing is that all were on time all through the pick up points which itself is a major achievement.
Two vehicles full of volunteers set off to a remote village which is about 170 KM away from Hyderabad. 

School children were eagerly waiting for us to give us a warm welcome. The team headed straight to the venue and participated in the Shankusthapana program. Each of the volunteers got an opportunity to plant a sapling on this memorable day. Later the children showcased their talents to the visiting team, the team was very impressed and touched by their performances.

Here are some glimpses of this memorable event:


















  



For more picture click HERE.

1 February 2012